METHODOLOGY · SCHEMA 1.3
How the status is made, and where it is weak.
A status is only as useful as its stated limits. This page describes the measures, the baseline, the interval and how it was tested, the status rule, and what the method cannot see.
1 · What is measured
Molten iron and slag emit strongly in shortwave infrared. Each works is measured two ways:
Slag areas are outlined per works from a heat-frequency map and a review of the imagery, without using any output data. Stored hot material that is not production, such as the slab yard at Duisburg, is excluded.
2 · Three sources, combined
The sources are combined by inverse variance: the one with more and steadier observations counts more. VIIRS dominates at cloudy coastal works such as IJmuiden; the optical sources contribute more at Linz. MODIS (Terra and Aqua, 1 km) was tested and left out: it sees these works on only about 30 % of days and lowered the fit to official output.
3 · Normal, and the interval
The index is the % difference between this period's heat and the same calendar month in the baseline years 2022–2025, with known outages left out of the baseline. 0 means normal. Works roll up to countries and to Europe weighted by typical annual output.
Every value carries a 95 % interval. Nights, not overpasses, are the independent observations; each week's spread is steadied with the works' long-run spread; the baseline's own error is included. Tested without assuming what the truth is: two weeks of the same month share a baseline, so their difference should fall outside the combined interval about 5 % of the time. It does 6 % of the time (23 % before the 1.2 fix).
Single weeks are noisy. Status and the brief use the 4-week index.
4 · Clouds and empty nights
VIIRS lists only what it detects, so a night with no detection at a works is either cloudy or cold. Since 1.3 a night counts as zero heat when ERA5 shows clear sky at the works at 01 and 02 UTC; cloudy nights stay out. On clear nights the large works are detected 92–100 % of the time, so an empty clear night does mean the works was not hot. Such nights are rare at large works and matter most at small or partly idle ones.
A cloudy week has fewer observations, so the interval widens. Every row states how many observations stand behind it (n_viirs, n_viirs_zero, n_s2, n_landsat).
Recent weeks are provisional while they use near-real-time VIIRS and preliminary ERA5. They become final when the archives replace them, after about two to three months.
5 · Status and outage rule
Checked against known stops: the rule catches Salzgitter blast furnace A (2023; alert three weeks after the stop), IJmuiden Hoogoven 6 (2023–24) and the Taranto stop from May 2025. It misses Linz blast furnace 5 (2023), about 17 % of that works' iron capacity: the index fell about 13 %, below normal but above the line. Not every possible outage is a real stop.
6 · Validation
| COMPARED WITH | UNIT | N | R |
|---|---|---|---|
| Eurostat EU iron and steel production | month, composite of 19 works | 62 | 0.74 |
| Same, 3-month averages | month | 60 | 0.90 |
| Same, month-on-month change | month | 61 | 0.07 |
| Verified CO₂ emissions (EU ETS) | works-year 2022–25, 8 longest-covered works | 32 | 0.80 |
| Same, all 19 works | works-year 2022–25 | 75 | 0.69 |
| Crude steel output (worldsteel), 6 countries where the covered works make most of the blast-furnace steel | country-year 2022–25 | 24 | 0.91 |
| Same, all 12 countries | country-year 2022–25 | 48 | 0.21 |
Each series is compared as % against its own 2022–2025 mean, or the same month in those years. Read the weak rows as plainly as the strong ones. Month-to-month the index tells little beyond the official series: it follows the level and the cycle, not the next number. In Poland, Italy and Czechia a single partly idled works stands for a whole country whose output includes other producers, so the country comparison there does not hold. Official monthly figures per works do not exist to test against.
7 · Known blind spots
- One furnace of several: a partial stop under about a quarter of a works' capacity shows as a dip, usually under the outage line (see Linz 2023).
- Four years of baseline. Unusual years move it, and works converting to electric furnaces or direct reduction will drift from it.
- Hot stored material can mimic production. At Duisburg a slab yard was found and excluded because the index disagreed with ETS emissions, so that works' 2022–25 fit is partly in-sample.
- Electric-arc furnace steel is not covered; the method sees integrated blast-furnace works.
- Twelve of the 19 works rest on VIIRS alone until their slag areas are reviewed; their intervals are wider.
- FIRMS lists detections above a threshold, so weak heat within a night is lost even when the night counts.
8 · As published, and changelog
Each Monday's release is stored unchanged under its date. Point-in-time files stack every release with its as_of date, so you can see what was known when. Releases are kept from November 2026; history before that was reconstructed and is marked as such. Every change of method is recorded with the schema version.
9 · Data licences
Copernicus Sentinel-2 data are free and open, including for commercial use, with attribution: "Contains modified Copernicus Sentinel-2 data [year]". Landsat data are public domain (USGS). VIIRS active fire data come from NASA FIRMS under NASA's open data policy. ERA5 cloud cover: "Contains modified Copernicus Climate Change Service information [year]". Eurostat data are reused with attribution. Country boundaries: Natural Earth (public domain).
Ferrosat publishes measurements, not investment advice.